£153,282
Aircraft Location:Santa Ana, California, USA
Seller Information
View Seller InformationOC Aircraft Sales
Contact:Gary Sequeira
Phone:(949) 922-5263
Newport Beach, California, USA
General
Year
1977
Manufacturer
Model
Serial Number
E1164
Registration #
N759VL
Condition
Used
FlightRules
IFR
Based at
KSNA (John Wayne)
Airframe
Total Time
4,120
Fuel Capacity Volume
302.83 L
Airframe
Major price reduction!!! Our seller says it’s time to move on.
Brand New Paint Job. #1 Airframe log Missing from original to 1998 with 2566.7 Airframe hours. Airframe repairs 1979. Many, many positive features. Hangared, and it shows!! Fresh annual March, 2026.
Engine
Engine 1 Make/Model
CONTINENTAL IO520BA
Engine Serial Number
280819-R
Engine Horsepower
212.52 kW
Engine 1 Time
863 SMOH
Engine TBO
1700
Year Engine Overhauled or Installed as New
2005
Engine Time Remaining To Overhaul
837
Props
Prop Manufacturer
MCCAULEY
Prop Model
3A32C76
Prop Time
1596 SMOH
Number of Blades
3
Blade Composition
Aluminum
Avionics
ADS-B Equipped
Yes
WAAS
Yes
Active Traffic
Yes
Engine Monitor
Yes
Avionics/Radios
STEC 55 Autopilot/Altitude Hold
Garmin 530 WAAS GPS
Garmin 430 WAAS GPS
Garmin GTX 300 Transponder/ADSB feature
Garmin GMA 340 Audio Panel/Intercom system
King KCS 55A Slaved HSI system
WX 10 Storm Scope
Graphic Engine Monitor
Fuel Flow Totalizer
Additional Equipment
Additional Equipment
Elec. Door Seal
Aux Vacuum system
Hamilton Vertical Compass Card
Foldable Card Table
Exterior
Year Painted
2024
Exterior
Overall White/2 Tone Maroon trim. New.
Interior
Number of Seats
6
Configuration
Passenger
Interior
Excellent Grey Leather.
Inspection Status
Inspection Status
Fresh extensive annual March, 2026.
Airworthy
Yes
Service Logs
Propeller
Engine
Aircraft

Aviation’s Most Powerful Operating Cost Analytics Tool In A Single App
Aircraft Cost Calculator enables users to determine the true operating costs of 500+ aircraft and helicopters in our database.Get Aircraft Operating Cost Reports Now
- Detailed Aircraft Information
- Aircraft Performance Data
- Payment Schedule
- Annual Fixed Costs
- Annual Variable Costs
- Hourly Cost Analysis
- Annual / Monthly Budgets

